Skip to content

Warranty & refrigerant

Get the warranty money back. Keep the refrigerant paperwork straight.

A warranty desk that checks coverage on the job, builds the claim, tracks the RGA and chases the credit, plus a refrigerant log per unit and per tech that calculates leak rates, starts repair deadlines and flags missing EPA 608 cards.

Warranty claim

Compressor · Carrier 24ACC6 · installed 2021

CoverageParts, 10 yr
File byNov 14
Defective partRGA shipped
CreditPending $412

Leak case

Walk-in cooler · 42 lb R-448A

Added this visit9 lb 4 oz
Leak rate (annualized)31%
Repair duein 26 days
Tech 608 certOn file
Illustration: a warranty claim and a refrigerant leak case

What it does

Everything warranty & refrigerant does for your shop

Coverage check on the job

Before a part is pulled, the tech sees parts and labor, parts only, labor only, not covered, or unknown. Dates on the unit win; otherwise the install date and the manufacturer's rule give an estimate that is labelled as one.

Claims that follow through

Draft, submitted, approved, denied, credit received. Each claim carries the failed part, old and new serials, labor hours, photos and a file-by date worked out from the repair date and the manufacturer's claim window.

Defective-part returns

A return opens with the claim when the vendor wants the part back. Enter the RGA number, carrier and tracking, and the ship-by date turns amber seven days out and red when it passes.

Credits reconciled by vendor

Approved amount against credited amount, per distributor or manufacturer, with a list of claims still awaiting credit and claims that were short-paid.

Refrigerant log per unit and tech

Every charge and recovery is a line with refrigerant, ounces, cylinder, job, unit and technician, captured on the phone even with no signal, and exported to CSV with the tech's EPA 608 number.

Leak-rate engine and repair clocks

Pick the annualizing or rolling-average method. When a unit crosses its appliance-type threshold, a leak case opens with a 30-day repair date, verification tests and a retrofit or retirement plan if the follow-up fails.

EPA 608 cards and cylinders

Certifications by type and number, checked against the appliance category on every entry. Cylinders by barcode, with tare, net weight, charge and recovery history, and warnings when a balance goes short.

How it works

Step by step

  1. 1

    Set your manufacturer rules

    Registration window, parts years registered and unregistered, labor years, claim window and return ship-by days, per manufacturer. Until you do, typical terms are used and shown as approximate.

  2. 2

    Tech checks coverage on the unit

    From the equipment screen in the field app, the tech sees coverage and can start a draft claim on a job they're assigned to.

  3. 3

    Office files and tracks

    The warranty desk shows drafts, returns due, registrations due and claims awaiting credit, each with its own tab and count.

  4. 4

    Log refrigerant as you work

    The tech enters what was added or recovered and from which cylinder. The leak rate is calculated on save and a leak case opens if the unit is over its threshold.

  5. 5

    Close the loop

    Repair, initial and follow-up verification tests, and a compliance report with totals by refrigerant and tech, open leak cases, chronic leakers and certification exceptions.

Who it helps

Service manager
Sees every claim, return and leak case with a due date, instead of a folder of distributor emails.
Technician
Knows before pulling a compressor whether it's covered, and logs refrigerant in the same app as the job.
Owner or controller
Sees warranty credits owed by vendor and has a refrigerant record that holds up when a commercial customer or inspector asks.

What to measure

Warranty claims awaiting payment
A dictionary metric: claims approved or submitted with no credit yet, with the jobs behind the number.
Claims filed late
Count claims submitted after their file-by date. Aim for zero; each one is money a manufacturer can refuse.
Open leak cases past due
From the leak case list, filtered to overdue. Anything here is a compliance exposure on a customer's equipment.
Certification exceptions
Refrigerant entries logged by someone with no 608 card on file or the wrong type. Shown in the compliance report and the CSV.

Compared with ServiceTitan

How TradesWork warranty & refrigerant compares

ServiceTitan stores manufacturer and service-provider warranty dates on installed equipment and shows warranty status to the office and techs. Its equipment help article does not describe claim filing, part returns or refrigerant tracking. TradesWork builds the claim, the return and the credit, and adds a refrigerant log with leak-rate math.

 ServiceTitanTradesWork
Warranty dates on equipmentManufacturer and service-provider warranty start and end dates on the equipment recordSame dates, plus per-manufacturer rules that estimate coverage from the install date when dates are missing
Who sees warranty statusVisible on the equipment record to office staff and techniciansCoverage check on the unit in the field app, with a start-a-claim prompt on covered units
Warranty reportingUse the Equipment custom reporting data source or the APIClaims, returns, registrations and vendor credit reconciliation built in, plus two dictionary metrics

ServiceTitan details from its public help center and published pages; see sources below.

Two kinds of money leak out of an HVAC or refrigeration shop without anyone noticing. The first is warranty: a covered compressor gets replaced, the claim never gets filed or gets filed after the window, and the defective part sits in the truck until the return authorization expires. The second is compliance: a commercial unit gets topped off four times in a year and nobody does the math that would have said it needed a repair within 30 days.

Both problems are bookkeeping problems. The information already exists on the job: the unit, the serial, the install date, the part, the pounds added. This feature puts it in one place and puts a date on every next step.

The warranty desk, step by step

Most shops handle warranty with a spreadsheet, a pile of distributor emails and whoever remembers. The warranty desk replaces that with five tabs: Claims, Part returns, Registration, Credits and Manufacturer rules. Each tab shows a count of what needs attention, so the morning check takes a minute.

  1. 1

    Coverage check

    On the equipment screen, the tech sees one of five answers: parts and labor covered, parts covered, labor covered, not covered, or coverage unknown. A unit with no dates at all is unknown, never covered.

  2. 2

    Draft claim

    A tech can start a draft from a job they're assigned to. The office can start one on any unit. Claims are numbered WC-1001 and up and can target the distributor or the manufacturer.

  3. 3

    File by the deadline

    The file-by date is the repair date plus the manufacturer's claim window. Submitted, approved and denied are tracked; a denied claim can go back to draft for a second try.

  4. 4

    Return the part

    If the vendor wants the part, a return opens automatically. Entering the RGA number moves it to ready to ship; carrier and tracking close it out.

  5. 5

    Match the credit

    When the credit memo arrives, record the amount. The Credits tab groups claims by vendor and shows what's still owed and what was short-paid.

Manufacturer rules, and why the defaults say approximate

Each manufacturer gets one editable rule: registration window in days, parts coverage in years when registered and when not, labor years, claim window and return ship-by days. Until you enter your own, TradesWork uses typical terms (60-day registration, 10 years parts registered, 5 unregistered, no labor, 30-day claim window, 30-day ship-by) and every coverage answer built on them says so. Manufacturer terms vary by brand, product line and registration, so treat the defaults as a starting point and copy your distributors' actual terms in.

Registration before it's too late

Many manufacturers give longer parts coverage only if the unit is registered within a set window after installation. The Registration tab lists every unit installed in the last 180 days that isn't confirmed, with a "due soon" flag 14 days before the window closes. The packet is prefilled from the job and lists anything missing, such as a serial or install date. You submit it on the manufacturer's site and mark it confirmed, which also marks the other units installed with it.

The refrigerant log

The log lives under Compliance and has five views: leak cases, the refrigerant log, cylinders, certifications and the report. Entries come from the field app, which queues them when there's no signal and saves each entry once even if the tech taps twice.

Each charge or recovery records the refrigerant, the amount in ounces, the unit, the job, the cylinder and the technician. TradesWork knows 13 common refrigerants, from R-22 and R-410A to R-454B, R-32, R-448A and R-290, with their safety class, GWP and family, and each note is marked informational rather than legal advice.

Cylinders

Cylinders are tracked by barcode as new refrigerant or recovery. Net weight is gross minus tare, and every receive, charge, recover, weigh and return is a ledger line. Refrigerants can't be mixed in a cylinder, and recovered refrigerant can only go into a recovery cylinder. A charge with no cylinder named is allowed but carries a warning, and a balance that goes short or over capacity flags the cylinder for a weigh.

EPA 608 certifications

Certified technicians must keep proof of certification at the place of business1. The Certifications tab stores each tech's type (I, II, III or Universal) and number, with optional issuer and dates. On every refrigerant entry, TradesWork checks whether the tech's card covers the appliance category. A missing or mismatched card doesn't block the entry. It records a certification issue, such as "doesn't cover high-pressure appliances (Type II)", which shows up as an exception in the report and the CSV.

The leak-rate engine

Under EPA's Section 608 rules, appliances with 50 or more pounds of ozone-depleting refrigerant must be repaired when they leak above a trigger rate over 12 months: 30% for industrial process refrigeration, 20% for commercial refrigeration, and 10% for comfort cooling and other appliances. Repairs are due within 30 days, followed by verification tests; if a repair doesn't hold, a retrofit or retirement plan is due2.

Appliance type in TradesWorkLeak-rate thresholdRepair dueAfter a failed follow-up test
Comfort cooling10%30 daysRetrofit or retirement plan, 30 days
Commercial refrigeration20%30 daysRetrofit or retirement plan, 30 days
Industrial process30%30 daysRetrofit or retirement plan, 30 days

You choose the calculation company-wide. Annualizing takes the amount added, divides it by the full charge, and scales it to a year by the days since the last addition. Rolling average takes everything added in the past 365 days (or since the last passing follow-up test, if that's shorter) and divides by the full charge. Both are methods defined in the rule3. If the full charge isn't recorded, TradesWork doesn't guess: the rule simply doesn't apply until someone enters it.

Annualizing method

pounds added ÷ full charge × 365 ÷ days since the last addition (capped at 365)

Scope settings

The scope setting decides which units the engine watches:

  • ODS only, 50 lb and up: the traditional Section 608 scope.
  • All refrigerants, 50 lb and up: the default, and the conservative choice for shops that service commercial equipment.
  • AIM Act: adds HFC appliances of 15 pounds or more with a GWP above 53 from January 1, 2026. EPA's Emissions Reduction and Reclamation rule, published October 11, 2024, set that leak repair requirement4, with a narrow exemption for residential and light commercial air conditioning and heat pumps5. This setting is labelled pending legal review in the product.

Leak cases

When an entry pushes a unit over its threshold, one leak case opens for that unit. The case moves through Repair due, Repaired, verify, Verified, Failed follow-up and Retrofit / retirement plan. The follow-up test date is set 10 days after the initial test; the product notes that start point is an approximation, so confirm the timing for your situation. Extending a date takes a later date and a note. The 120-day industrial shutdown extension isn't calculated automatically.

Chronic leakers

Owners of 50-pound-plus ODS appliances that leak 125% or more of their full charge in a calendar year must report to EPA by March 17. The compliance report lists any unit that crossed 125% with a "report to EPA by March 1" note. You file it; TradesWork doesn't submit anything to EPA.

Who uses this, by trade

  • Residential HVAC: the warranty side does most of the work. Coverage checks on compressors, coils and control boards, registration reminders after installs, and credits matched by distributor. The refrigerant log matters for your records and for any light commercial work.
  • Commercial HVAC and refrigeration: the leak-rate engine is the reason to look. Walk-in coolers, rack systems and rooftop units often sit above 50 pounds, and your customers rely on your records. Pair this with multi-location and commercial for agreements and site contacts.
  • Appliance repair: small appliances are covered by Type I certification; the certification checks treat units of 5 pounds or less as small, which is an approximation because TradesWork can't know whether a unit was factory sealed.

What to set up first

First week

  • Enter manufacturer rules for your top three brands from your distributor terms
  • Add every tech's EPA 608 type and number
  • Record full charge on commercial units you service regularly
  • Choose annualizing or rolling average and your scope setting
  • Barcode the cylinders on each truck and weigh them in
  • Look at the Registration tab for installs from the last six months

The report exports to CSV with one row per entry: date, kind, refrigerant, ounces and pounds, unit, customer, job, cylinder, technician, 608 number, certification issue, leak rate and warnings. That's what a commercial customer's facilities manager usually asks for.

Footnotes

  1. 40 CFR 82.161, technician certification, via EPA. https://www.epa.gov/section608/section-608-technician-certification-requirements ↩

  2. EPA, Stationary refrigeration leak repair requirements. https://www.epa.gov/section608/stationary-refrigeration-leak-repair-requirements ↩

  3. 40 CFR Part 82, Subpart F (leak rate definitions in 82.152). https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-82/subpart-F ↩

  4. EPA, Regulatory actions for managing HFC use and reuse. https://www.epa.gov/hfcs/regulatory-actions-managing-hfc-use-and-reuse ↩

  5. Beveridge & Diamond (law firm), EPA finalizes HFC Emissions Reduction and Reclamation program. https://www.bdlaw.com/publications/epa-finalizes-hfc-emissions-reduction-and-reclamation-program/ ↩

  6. Federal Register, May 26, 2026, proposed exclusion of road and intermodal transport refrigeration. https://www.federalregister.gov/documents/2026/05/26/2026-10388/phasedown-of-hydrofluorocarbons-excluding-road-and-intermodal-container-transport-refrigeration ↩

  7. EPA, Recordkeeping and reporting requirements for stationary refrigeration. https://www.epa.gov/section608/recordkeeping-and-reporting-requirements-stationary-refrigeration ↩

Free download

HVAC Maintenance Checklist (Cooling + Heating)

Printable tune-up checklists for AC, heat pump and furnace visits, with readings to record.

Get it free
  • Cooling / heat pump tune-up checklist
  • Gas furnace tune-up checklist
  • Readings log: superheat, subcooling, static pressure, temperature split, amps
  • Customer recommendations section

Frequently asked questions

No. It builds the claim from the job (model, serial, failed part, labor hours, photos), tells you the file-by date and tracks it through approval, part return and credit. You submit it through the distributor or manufacturer portal and record the outcome.

Ready to run a tighter shop?

Try TradesWork free for 14 days. Bring your customers and price book, or start fresh with a price book made for your trade.

  • No credit card
  • No contract
  • Cancel any time
Three workers in coveralls unloading equipment from a van